Projects

Copernicus Project – Expansion of the BASF catalyst factory in Środa Śląska

  • Sector: Chemical and petrochemical industry
  • Status: completed
  • Period of completion: 2019
  • Client: BASF Polska Sp. z o.o.

Designing (3D model for installations, structures, devices, isometric drawings for installations> DN40 and plot plans for the entire scope, workshop design documentation of steel structure and detailed design documentation of foundations, as-built documentation “red-mark”)
Deliveries of pipelines and piping components, steel structure, measuring instruments and control cabinets, manual and automatic fittings, pumps, fans, filters, manifolds, etc.
Execution of foundations for devices (DeNOx, SCRUBBER, chillers, cooling towers), Compressor building (comprehensive), Steel structure (landings, staircases, flyovers, pipeline supports, cable routes)
Modernization of existing platforms (active plant).
Installation of devices, pipelines / ducts together with fittings and support structure, thermal insulation of pipelines / ducts and selected devices, electrical installation together with equipment of main switchboards and equipment cabinets, control cabinets and automation wiring for sensors, valves and devices.
Pre-commissioning – I / O check, engine check, tank weight calibration